RSI Nears Completion of the Concrete Work on the Thomas P. Murphy Design Studio Building

RSI Nears Completion of the Concrete Work on the Thomas P. Murphy Design Studio Building

RSI is providing turnkey concrete services from foundations through roof for the new University of Miami School of Architecture design studio building.

read more »

posted in: architectural, current, museum, turnkey, current work

RSI Wins 2017 Craftsmanship Award

RSI Wins 2017 Craftsmanship Award

RSI is honored to have won a Craftsmanship Award for our team’s work on the Sweetbird South project: The Construction Association of South Florida judged RSI’s work on the project exceptional and declared the work a winner in the Concrete Formwork category.

read more »

posted in: architectural, civil, museum, current work

RSI Awarded Mark Sarasota Condominium Project

RSI Awarded Mark Sarasota Condominium Project

RSI will be providing a turnkey concrete package for the new Mark Sarasota condominium building.

read more »

posted in: condos, current, turnkey, current work

RSI Awarded Virage Condominium Project

RSI Awarded Virage Condominium Project

RSI will be providing a turnkey concrete package for the Virage high-rise condominium project on Bayshore Drive Tampa.

read more »

posted in: condos, current, turnkey, current work

RSI Work Complete, New Hyatt Hotel Opens

RSI Work Complete, New Hyatt Hotel Opens

RSI provided a turnkey concrete package for the new Hyatt Hotel in St. Petersburg, a 174-room, 12-story structure, with 17,000 square feet of retail space.

read more »

posted in: completed, hotel, turnkey

RSI picks up additional work for Coastal Construction on the Dacra Project

RSI picks up additional work for Coastal Construction on the Dacra Project

RSI’s new work on the Dacra project includes the structural portion of the facade renovation of Building 4100 in the Dacra complex.

read more »

posted in: civil, current, current work

RSI Awarded The Lodge Hotel at IMG in Bradenton

RSI Awarded The Lodge Hotel at IMG in Bradenton

RSI is providing turnkey concrete services from foundations through post-tension decks for the Lodge Hotel at the IMG Sports Academy in Bradenton.

read more »

posted in: current, hotel, turnkey, current work

RSI begins work on Arte, a new Surfside project

RSI begins work on Arte, a new Surfside project

RSI is providing a turnkey concrete package for the new Arte condominium building at 8955 Collins Avenue, Surfside, Miami Beach.

read more »

posted in: condos, current, turnkey

RSI Awarded The Thomas P. Murphy Design Studio Building

RSI Awarded The Thomas P. Murphy Design Studio Building

RSI will be providing turnkey concrete services from foundations through roof for the new University of Miami School of Architecture design studio building.

read more »

posted in: architectural, current, university, turnkey, current work

RSI Awarded HuB Lofts Project

RSI Awarded HuB Lofts Project

RSI will be providing a turnkey concrete package for the new HuB Lofts project on Second Street near Goodrich Avenue in Sarasota.

read more »

posted in: apartments, current work

Fairfield Inn on Clearwater Beach Completed

Fairfield Inn on Clearwater Beach Completed

RSI provided a turnkey concrete package for the new Fairfield Inn and Suites on Clearwater Beach.

read more »

posted in: completed, hotel, turnkey, archived

Guesthouse Hotel Complete

Guesthouse Hotel Complete

RSI provided all the concrete work for the 10-story post-tensioned structural deck system for the new hotel and adjacent parking garage.

read more »

posted in: completed, hotel, turnkey

RSI Completes Bliss Condominium Project

RSI Completes Bliss Condominium Project

RSI recently finished work on the lower garage portion of the Bliss condominium building, completing the turnkey concrete services it provided to Voeller Construction, the general contractor of the project.

read more »

posted in: completed, condos, turnkey

RSI awarded Grand Flamingo Garage/Lanai Addition, Miami Beach

RSI awarded Grand Flamingo Garage/Lanai Addition, Miami Beach

RSI will be providing a turnkey concrete package from foundations through post-tensioned deck for a garage and amenities lanai addition to the Flamingo South Beach complex in Miami.

read more »

posted in: condos, current, turnkey, current work

Aerial View and Video of Sweetbird Roof Pour

Aerial View and Video of Sweetbird Roof Pour

Please go here to view a video of the Sweetbird roof pour: https://www.youtube.com/watch?v=o0becHT44Dc.

read more »

posted in: current, turnkey, current work

RSI Tops Out Kolter Hotel

RSI Tops Out Kolter Hotel

RSI recently topped out the Hyatt Hotel in St. Petersburg, developed by the Kolter Group.

read more »

posted in: completed, hotel, turnkey, archived

RSI Visits World of Concrete – Las Vegas

RSI Visits World of Concrete – Las Vegas

The RSI attendees from left to right: Jeff Lynn, Francisco Gomez, Octavio Angeles, Miguel Tellez, Julian Campy.

To keep informed about the latest innovations in concrete construction and technology, RSI recently sent a team to the 2017 World of Concrete tradeshow in Las Vegas.

read more »

posted in: current

RSI Completes GLF Constructions Headquarters

RSI Completes GLF Constructions Headquarters

RSI provided a turnkey concrete package for GLF Construction’s new headquarters, including extensive architectural concrete finishes throughout. GLF Construction is a worldwide provider of construction and civil construction services, with a company history dating to 1905 in Italy.

read more »

posted in: architectural, completed, turnkey

RSI awarded Sweetbird South Retail Building

RSI awarded Sweetbird South Retail Building

RSI will be providing a turnkey concrete package, from foundations through roof deck, for the Sweetbird South retail building in Miami. RSI’s work on the new structure will last five months.

read more »

posted in: architectural, current, turnkey, current work

RSI Project Near Completion: Fairfield Inn, Clearwater Beach

RSI Project Near Completion: Fairfield Inn, Clearwater Beach

RSI is nearing completion of its work on the Fairfield Inn & Suites on Clearwater Beach, a 6-story building with 102 rooms and a total area of 113,323 square feet.

read more »

posted in: current, hotel, turnkey, current work