Grand Flamingo Garage/Lanai Addition

Grand Flamingo Garage/Lanai Addition Grand Flamingo Garage/Lanai Addition

Contractor: GT McDonald

Categories: , ,

Location: Miami Beach

RSI will be providing a turnkey concrete package from foundations through post-tensioned deck for a garage and amenities lanai addition to the Flamingo South Beach complex in Miami.

Projects » Sweetbird South Retail Building

categories:

Sweetbird South Retail Building

Sweetbird South Retail Building Sweetbird South Retail Building

Architect: Reiulf Ramstad Arkitekter

Contractor: GT McDonald

Categories: ,

Location: Miami

Two-story mild-reinforced concrete slab/beam structure, with unique geometry at the upper roof deck, including multifaceted slopes and various angles.

Similar Projects:

Projects » Hyatt Hotel St. Petersburg

categories:

Hyatt Hotel St. Petersburg

Hyatt Hotel St. Petersburg Hyatt Hotel St. Petersburg Hyatt Hotel St. Petersburg Hyatt Hotel St. Petersburg

Architect: SB Architects

Contractor: Kast Construction

Categories: , ,

Location: St. Petersburg

RSI provided a turnkey concrete package for the Hyatt Hotel in St. Petersburg, a 174-room, 12-story structure, with 17,000 square feet of retail space.

Projects » The Manor at Harbour Island

categories:

The Manor at Harbour Island

The Manor at Harbour Island The Manor at Harbour Island The Manor at Harbour Island The Manor at Harbour Island

Contractor: Moss & Associates

Categories: , ,

Location: Tampa

RSI is providing a turnkey concrete package for the Manor at Harbour Island, a 21-story building with 340 units and a skywalk.

Projects » Fairfield Inn and Suites Clearwater Beach

categories:

Fairfield Inn and Suites Clearwater Beach

Fairfield Inn and Suites Clearwater Beach Fairfield Inn and Suites Clearwater Beach Fairfield Inn and Suites Clearwater Beach

Architect: BEHAR+PETERANECZ: ARCHITECTURE

Contractor: Creative Contractors, Inc.

Categories: , ,

Location: Clearwater

RSI will be providing a turnkey concrete package for the new Fairfield Inn and Suites on Clearwater Beach.  The new hotel will be a 6-story building with a 102 rooms and a total area of 113,323 square feet.

Similar Projects:

Projects » Dacra Paradise Plaza Project

Dacra Paradise Plaza Project

Dacra Paradise Plaza Project Dacra Paradise Plaza Project Dacra Paradise Plaza Project Dacra Paradise Plaza Project

Contractor: Coastal Construction

Categories: , ,

Location: Miami

RSI will be providing a turnkey concrete package for the Paradise Plaza project, including all foundation work through top-out.

The project includes an underground parking garage with a hydrostatic slab and cast-in-place walls for the entire perimeter of the garage.

Similar Projects:

Projects » Surfstyle

categories:

Surfstyle

Surfstyle Surfstyle

Contractor: Cuesta Construction

Categories: ,

Location: Miami Beach

RSI will be providing a turnkey concrete package, including Class A finish exposed concrete, for the new 43,200 square-foot Surfstyle parking garage and retail space at 1155 Collins Avenue, just 1 block west of Miami Beach in the heart of South Beach.

Projects » Salvador Condominiums

categories:

Salvador Condominiums

Salvador Condominiums Salvador Condominiums

Architect: Mesh Architecture

Contractor: Kellogg & Kimsey

Categories: ,

Location: St. Petersburg

RSI will be providing cast-in-place concrete services for the new Salvador condominium project in downtown St. Petersburg, including the foundations, vertical work, and two post-tensioned structural decks totaling just under 50,000 square feet. The work is slated to take 20 weeks.

Projects » Bliss Condominiums

categories:

Bliss Condominiums

Bliss Condominiums Bliss Condominiums Bliss Condominiums

Architect: Mesh Architecture

Contractor: Voeller Construction

Categories: , ,

Location: St Petersburg

RSI is providing turn-key concrete services for the new Bliss condominium building in St Petersburg, including the 5-story parking garage and the 13-story post-tensioned residential portion of the structure.

Similar Projects:

Projects » Clearwater Beach Guesthouse Hotel

categories:

Clearwater Beach Guesthouse Hotel

Clearwater Beach Guesthouse Hotel Clearwater Beach Guesthouse Hotel Clearwater Beach Guesthouse Hotel Clearwater Beach Guesthouse Hotel

Contractor: Wichman Construction

Categories: , ,

Location: Clearwater Beach

RSI provided all the concrete work for the 10-story post-tensioned structural deck system for the hotel and adjacent parking garage. The finished hotel is just under 400,000 total square feet, with about 350,000 structural, post-tensioned decks.

Similar Projects:

Projects » Edgewater Beach Resort on Treasure Island

categories:

Edgewater Beach Resort on Treasure Island

Edgewater Beach Resort on Treasure Island Edgewater Beach Resort on Treasure Island Edgewater Beach Resort on Treasure Island Edgewater Beach Resort on Treasure Island

Architect: Robert Hall

Contractor: Moss & Associates

Categories: ,

Location: Treasure Island

RSI will provide all the concrete work for the 6-story post-tensioned structural deck system for the new Edgewater Beach Resort on Treasure Island.

The overall building size will be approximately 180,000 square feet, with about 150,000 square feet of structural, post-tensioned desks.

Similar Projects:

Projects » Infinity on Longboat Key

Infinity on Longboat Key

Infinity on Longboat Key Infinity on Longboat Key Infinity on Longboat Key Infinity on Longboat Key

Architect: DSDG Mark Sultana

Contractor: Tandem Construction

Categories: , , ,

Location: Longboat Key

RSI has been awarded a contract for the Infinity Condominium on Longboat Key and will be providing turn-key concrete work for all the building concrete. The 5-story post-tensioned concrete structure will contain 11 luxury beachfront condominiums.

Projects » New GLF Headquarters

New GLF Headquarters

New GLF Headquarters New GLF Headquarters New GLF Headquarters New GLF Headquarters

Architect: Oppenheim Architecture + Design, Miami, FL

Contractor: GLF Construction

Categories: , ,

Location: Miami, FL

Turnkey concrete package for the new headquarters for GLF Construction, including extensive architectural concrete finishes throughout

Projects » Miami Metromover Project

Miami Metromover Project

Miami Metromover Project Miami Metromover Project

Contractor: Americaribe-Moriarty Joint Venture

Categories: , ,

Location: Miami, FL

RSI will be providing the commercial concrete work for the renovations of the Brickell City Centre 8th Street Metromover Station in Miami.

Projects » Gainesville Student Housing

Gainesville Student Housing

Gainesville Student Housing Gainesville Student Housing

Architect: Hochhauser Blatter Architects of Santa Barbara, CA

Contractor: Beal Derkenne Construction of Des Moines, IA

Categories: , ,

Location: Gainesville, FL

Turnkey concrete package for Next Level, two new student apartment buildings in Gainesville, FL.  The commercial concrete work includes foundations, columns, beams, an extensive amount of cast-in-place walls and 15” structural “podium” decks. The project has aggressive schedule demands: RSI has 16 weeks to complete both structural decks.

Projects » New St. Leo University Academic Building

categories:

New St. Leo University Academic Building

New St. Leo University Academic Building New St. Leo University Academic Building

Architect: Gould Evans, Tampa, FL

Contractor: Creative Contractors, Inc., Clearwater, FL

Categories: ,

Location: St. Leo, FL

RSI is providing a turnkey concrete package for the new 48,000 square foot academic building at St. Leo University in St. Leo, FL. The commercial concrete work for the structural steel building includes foundations, shear walls, and concrete on metal decks and will be complete by year’s end.

The new $14 million building replaces the 8,000-square-foot Crawford Hall and will be finished for the start of fall semester 2015.

The four-story building will include 16 classrooms and 24 faculty offices and will incorporate eco friendly design features. The exterior Spanish Mission style of the new structure will complement surrounding buildings and will be visible immediately when entering the campus.

The architect is Gould Evans of Tampa, FL, and the general contractor is Creative Contractors, Inc., of Clearwater, FL.  RSI is working closely with them to ensure on-time and within-budget completion of the new building.

Similar Projects:

Projects » H. Lee Moffitt Cancer Center

categories:

H. Lee Moffitt Cancer Center

H. Lee Moffitt Cancer Center H. Lee Moffitt Cancer Center

Contractor: Skanska

Categories:

Location: Tampa, FL

RSI was recently awarded the foundation concrete work for the H. Lee Moffitt Cancer Center’s new 200,000 square-foot, $74.2 million outpatient facility.

Projects » One Palm 10-story mixed-use building

categories:

One Palm 10-story mixed-use building

One Palm 10-story mixed-use building One Palm 10-story mixed-use building One Palm 10-story mixed-use building

Architect: Hoyt Architects

Contractor: Kellogg & Kimsey

Categories:

Location: Sarasota, FL

RSI will provide 260,000 square feet of post-tensioned deck for the 139-room hotel and 141-unit luxury apartment complex.

Projects » 321 Ocean Drive Miami Beach

categories:

321 Ocean Drive Miami Beach

321 Ocean Drive Miami Beach 321 Ocean Drive Miami Beach

Architect: Enrique Norten

Categories:

Location: Miami Beach

RSI commercial concrete is providing a turnkey concrete package for 321 Ocean Drive condominium complex on Miami Beach, Florida.

Projects » Finale Condo

categories:

Finale Condo

Finale Condo Finale Condo Finale Condo Finale Condo

Contractor: Creative Contractors

Categories:

Location: St. Pete Beach, Florida

The Finale at Sand Key in Clearwater on Sand Key Beach is a new seven story 23 unit condominium complex. RSI recently finished pouring the concrete for the commercial project, completing the concrete structures on the property according to the specs provided by the architect. We created a 7-story cast-in-place structure with post-tensioned decks using 5000 pounds-per-square-inch concrete and provided all materials, equipment, and labor to build the job.

Projects » T.I.A. Airside F Expansion

categories:

T.I.A. Airside F Expansion

T.I.A. Airside F Expansion T.I.A. Airside F Expansion T.I.A. Airside F Expansion T.I.A. Airside F Expansion

Contractor: Beck Group

Categories:

Location: Tampa, Florida

The Airside ‘F’ terminal of Tampa International Airport was being expanded with an additional 30,000 square feet and includes the renovation of 40,000 square feet of existing space.

RSI provided the concrete work for the interior renovation work as well as the signature canopy structure.

Projects » Westminster Living Facility

Westminster Living Facility

Westminster Living Facility Westminster Living Facility Westminster Living Facility

Architect: Chancey Design Partnership

Contractor: Wichman Construction

Categories: , , ,

Location: St. Petersburg, Florida

Westminster Shores is an adult living facility located just steps from the shores of Tampa Bay, in St. Petersburg’s Bahama Shores neighborhood. This five-story building is the newest addition to the 26-acre campus.

RSI provided full-service, high-quality turnkey concrete work for the Westminster Shores project,  from pile caps and grade beams through the post-tensioned roof slab.  The building consists of almost 90,000 square feet of space and includes approximately 70,000 square feet of post-tensioned deck.  RSI topped-out the concrete structure by pouring the roof slabs and completed the project with concrete cast-in-place stairs and the slab-on-grade.

Similar Projects:

Projects » Epicurean Hotel

Epicurean Hotel

Epicurean Hotel Epicurean Hotel Epicurean Hotel Epicurean Hotel

Contractor: Beck

Categories: , ,

Location: Tampa, Florida

The new Epicurean Hotel has 137 guest rooms and features a restaurant and wine bar, a retail wine shop, a bakery, full service spa, health club, swimming pool with cabanas, a second floor open-air special events area, rooftop lounge, and flexible function space.

The hotel, located directly across the street from the iconic Bern’s Steak House, also features a demonstration kitchen, home to the Bern Laxer School of Food and Wine.

Our work comprised all the commercial concrete work for the new hotel, including 110,000 square feet of post-tensioned deck. On this project, RSI was responsible for the design and engineering of the post-tensioned decks.  With great teamwork from the client and their design and engineering firms, RSI was able to provide a low-cost and structurally sound system that perfectly met the needs of the client and owner.

Similar Projects:

Projects » Hilton Garden Inn

Hilton Garden Inn

Hilton Garden Inn Hilton Garden Inn Hilton Garden Inn Hilton Garden Inn

Contractor: Beck Group

Categories: , , ,

Location: Tampa, Florida

In four months, RSI provided cast-in-place post-tensioned concrete for 112,000 square feet in the seven story building.

Projects » Florida International University

Florida International University

Florida International University Florida International University

Contractor: James A. Cummings

Categories: , ,

Location: Miami, Florida

Five-story precast joist and soffit beam structure totaling 75,000 sf. RSI completed the project in five months.

Similar Projects:

Projects » Sterling Assisted Living Facility

categories:

Sterling Assisted Living Facility

Sterling Assisted Living Facility Sterling Assisted Living Facility Sterling Assisted Living Facility

Categories: , ,

Location: Aventura, Florida

This is a six-story, 120,000 square-foot assisted living facility & one-story cast-in-place parking garage.

RSI was responsible for the pile caps, columns, shear walls & decks. Columns mounted form tables were utilized for 8” thick decks. The use of this system allowed the masonry to follow 2 stories behind the decks, therefore helping the contractor meet their tight schedule.

Projects » St. Petersburg College

categories:

St. Petersburg College

St. Petersburg College St. Petersburg College St. Petersburg College

Categories:

Location: Clearwater, Florida

RSI provided the commercial concrete for a 60,000 square foot laboratory building with reinforced columns, walls, decks, beams & slab-on-grade. The floors were 14 inches thick & contained 385 tons of reinforcing steel.

Similar Projects:

Projects » Pier 60 House Hotel

Pier 60 House Hotel

Pier 60 House Hotel Pier 60 House Hotel Pier 60 House Hotel Pier 60 House Hotel

Contractor: Brandon Construction

Categories: , , ,

Location: St. Petersburg, Florida

RSI completed the concrete for the ten-story post-tensioned structure, including 4 stories of parking, totaling 120,000 sf. This project was completed in five months.

Burby Engineering - Pier 60 House Hotel

Similar Projects:

Projects » Met West Office Headquarters

categories:

Met West Office Headquarters

Met West Office Headquarters Met West Office Headquarters Met West Office Headquarters

Contractor: Skanska USA

Categories: , ,

Location: Tampa, Florida

RSI provided the concrete for the nine-story steel building, including four 150-foot tall cast-in-place shear walls.  This project was completed in three months.

Projects » Miami Art Museum

Miami Art Museum

Miami Art Museum Miami Art Museum Miami Art Museum Miami Art Museum

Architect: Herzog & De Meuron

Contractor: John A. Moriarty & Associates

Categories: , , ,

Location: Miami, Florida

The new museum’s exterior includes polished and bush-hammered concrete walls and a trellis system, and the interior includes galleries with exposed architectural concrete walls and columns.  Throughout the museum, the design called for wide-open spaces, minimizing the need for columns or other supports, and RSI accomplished this using a Cobiax structural system.

As highlighted in the video below, taken by Museum Director Thom Collins, the pouring of the concrete was especially important in this project because seamless architectural concrete lines were integral to Herzog & De Meuron’s architectural design.

“RSI built the most complicated concrete frame I’ve ever seen. Not only was it complicated structurally but it had to look great. RSI delivered a fantastic result. We are glad they were on our team.”- John Leete president of John Moriarty of Florida.

Museum Director Thom Collins provides a behind the scenes look at the construction of the Miami Art Museum.
YouTube - Museum Construction

Learn all about the construction of the Miami Art Museum

Similar Projects:

Testimonial:

RSI built the most complicated concrete frame I've ever seen. Not only was it complicated structurally but it had to look great. RSI delivered a fantastic result. We are glad they were on our team.- John Leete president of John Moriarty of Florida

Projects » Dali Museum

Dali Museum

Dali Museum Dali Museum Dali Museum Dali Museum

Architect: HOK (Yann Weymouth)

Contractor: Beck

Categories: , , , ,

Location: St. Petersburg, Florida

RSI was selected for the structural concrete of the $30 million, 66,400-square-foot Salvador Dai Museum in St. Petersburg. The building features a one-way cast-in-place concrete slab and beam system for the base structural system. Internationally acclaimed architect Yann Weymouth, with HOK’s Tampa office, designed the museum. There were many challenges to be met with this structure: The building had to sustain hurricane winds, and it was built on a plot of land that was only 5 inches above sea level. The architect had specific ideas about eliminating surface lines in the structure. To accommodate these challenges, RSI worked very closely with the design team to ensure their vision.

Here is an article on the project at gostructual.com:
Protecting Dali’s Art »

Project images at www.hok.com:
Dali Museum images

Similar Projects:

Testimonial:

"...we were worried about using architectural concrete for the design of the new Dali Museum. RSI did an extraordinary job and we couldn't be more pleased with the outcome. We are all very proud of the way the museum turned out, thanks in large part to RSI"- Yann Weymouth AIA Director of design Florida HOK